This case study examines the erection of scaffolding at a property in Valebridge Road, Burgess Hill, specifically designed for solar panel installation. The scaffold provided safe, efficient access to the roof area, enabling workers to install the solar panels without compromising safety or the structure’s integrity. The project highlights a straightforward, single-platform scaffold setup tailored to the site’s requirements. This safe, efficient setup is just one example of our specialist solar panel scaffold in the area. Check out our other Burgess Hill scaffolding projects for more local case studies.
The scaffold was erected along the side of the bungalow, running parallel to the tiled roof below gutter level to facilitate access for solar panel fitting. It measured 10 linear metres in length, 2.1 metres in height (comprising 1 lift), and 5 boards deep, creating a stable working platform. The structure included guardrails on the outer side for fall protection and was positioned adjacent to the roof edge, allowing direct access to the installation area. Access to the platform was provided via a ladder secured at one end, with a safety gate for controlled entry.
This scaffold was constructed using the following materials:
The scaffold was built in a narrow space, adjacent to a wooden fence and near garden elements, including a wheelbarrow and storage bins. The platform was elevated to align with the gutter level for easier access to the roofline. The single-lift design minimised material use while providing sufficient height for the solar panel work.
The total cost for the scaffold hire was £500, covering 4 weeks. This included erection, maintenance, and dismantling, making it a cost-effective solution for the short-term solar panel installation project.
This scaffolding setup at the property in Valebridge Road, Burgess Hill, demonstrates an efficient application for residential solar panel installation, prioritising safety through robust materials and design. The structure’s dimensions and materials ensured reliable access, contributing to the successful completion of the work.