Free scaffold quotations and site visits

Search

Menu

For Scaffolding Supplies We Offer Collections & Deliveries
Free scaffold quotations and site visits are available, with flexible hire periods.
We also sell scaffolding and building supplies. Delivery or collection is available.

Delivery costs

Checkout to get your delivery cost

Click & Collect

Based in West Sussex

5-Star Reviews

Trusted by customers

Trade Pricing

Discounts on large orders

Rubbish Chute 1.1m Section

£48.00 ex. VAT

Delivery costs

Checkout to get your delivery cost

Click & Collect

Sussex Depote

5-Star Google Reviews

Trusted by customers

Trade Pricing

Best prices

Delivered within 2–5
business days

Order online and pick up from our yard

Operating from Aldingbourne, West Sussex

Payments Accepted:

Description

Safe Debris Disposal – Fast UK Delivery

Keep your site clean and safe with our modular 1.1m rubbish chute sections. Designed to channel construction waste, plasterboard, bricks, and general debris straight from scaffolding heights into a skip or collection area, they make waste management quick, tidy, and effortless.

Built from tough, impact-resistant polyethylene (MDPE/HDPE), each section locks securely with overlapping joints, heavy-duty captive chains, and brackets – no tools required. The result? A smooth, continuous drop every time.

Used by contractors across the UK — from busy London sites to rural projects in Scotland and coastal builds in Cornwall — these chutes help cut dust, reduce manual handling risks, and keep your site fully compliant with modern safety standards.

Key Benefits of Our Rubbish Chute Sections

  • Improved Site Safety – The fully enclosed drop prevents free-falling objects, aligning with Work at Height Regulations 2005 and reducing injury risks for workers and passers-by.
  • Efficient Waste Flow – Enables continuous disposal from height, slashing time lost to manual bag carrying or wheelbarrow runs across scaffolds.
  • Effective Dust Suppression – The sealed design minimises airborne particles, ideal for dry materials or windy UK weather conditions.
  • Simple Modular Assembly – The sections link rapidly; extend to any required height without specialist equipment.
  • Long-Lasting Durability – The UV-resistant, abrasion-resistant plastic handles repeated heavy use and outdoor exposure nationwide.
  • Better Waste Compliance – Supports easier segregation and recycling at source, helping meet CDM 2015 duties and potentially lowering disposal costs.

Typical UK-Wide Applications

These sections fit seamlessly into diverse projects where scaffolding provides access:

  • House extensions, loft conversions, and roof repairs across the UK.
  • Facade refurbishments, repointing, and rendering on commercial buildings.
  • Demolition prep, internal strip-outs, and high-level maintenance on multi-storey developments.
  • Solar installations, gutter works, or chimney repairs in residential and heritage settings.
  • Industrial or infrastructure sites requiring safe, enclosed waste transfer from elevated platforms.

 

Combine with our top hopper, side-entry hopper or universal fixing frame for a complete, reliable system.

Product Specifications – 1.1m Rubbish Chute Section

Specification

Detail

Length per section

1.1 m (effective working drop ≈1.0 m with overlap joints).

Diameter (nominal)

20 inches / ≈500 mm top opening; slight taper for flow.

Material

High- or medium-density polyethylene (MDPE/HDPE) – tough, UV-stabilised.

Wall thickness

Reinforced (typically 4–6 mm with wear-resistant ribs).

Connection system

Captive chain & bracket – no loose fittings required.

Weight per section

Approx. 8–10 kg (lightweight for transport and handling).

Compatibility

Standard 20″ UK rubbish chute systems; fixes to scaffold tubes via universal frames or window brackets.

Colour

Red to ensure it stands out on-site.

Compliance support

Aids adherence to UK construction regs (e.g., safe debris handling under CDM 2015).

 

Rubbish Chute Sections Information

  1. Secure the universal fixing frame to the scaffold standards using couplers at the entry level.
  2. Attach the top hopper (or side-entry variant) to the frame.
  3. Link the 1.1m sections end-to-end downward, locking chains firmly at each joint.
  4. Direct the bottom outlet over a skip or contained area.
  5. Check the full run for alignment and free hang before loading.

 

For drops over 10–12 m (≈10–12 sections), add intermediate ties; contact us for advice on taller or exposed UK sites.

Aspect

With Modular Rubbish Chute

Manual Handling (Bags/Wheelbarrows)

Disposal speed

Fast, continuous

Slow, repetitive trips

Risk of falling debris

Very low (enclosed)

Higher exposure

Dust & mess control

Strong suppression

Often significant

Labour demand post-install

Minimal

High ongoing

Regulatory fit

Excellent for height work

Frequently inadequate

Our sections promote compliant waste disposal under:

  • Work at Height Regulations 2005.
  • Construction (Design and Management) Regulations 2015.
  • HSE guidance on elevated debris management.

 

Inspect before each use, avoid kinks or obstructions, and limit to suitable materials (no liquids, hazardous waste, or oversized items). We provide guidance during quotations to ensure site-specific safety.

An 8-yard or larger open skip is ideal for most jobs; centre the chute outlet and shield from wind where needed.

Estimate based on scaffold height plus 10–20% for overlaps. A 7 m drop usually needs 7–8 sections + hopper/frame.

Yes, each section is designed for standard construction debris (bricks, blocks, timber, plaster); avoid jamming items or excessive overloading.

Yes, the UV-stabilised material copes with rain, wind, and coastal conditions; use extra securing ties on high-wind sites.

Nationwide delivery is available (typical 2–5 business days); collection from our Aldingbourne, West Sussex yard is also offered. Minimum orders may apply for distant areas — call for a quote.

Material Type

Suitable?

Notes / Precautions

Alternative if Unsuitable

Brick offcuts, small concrete pieces

Yes

Keep pieces under 200–250 mm to avoid jams; drop one at a time if large

Use a larger-diameter chute if frequent heavy rubble

Plasterboard sheets/offcuts

Yes

Break into manageable sizes; avoid large pieces

Manually lower if oversized

Timber offcuts, battens

Yes (small/medium)

Cut to <500 mm length; no protruding nails

Direct drop for long pieces

Drywall/plaster dust

Yes

Excellent for dusty materials – reduces airborne spread

N/A

Metal scraps (small)

Yes

Ensure no sharp edges that could cut the plastic over time

Use protective lining for heavy/abrasive metal

Glass, tiles, sharp shards

Conditional

Wrap or bag first to prevent punctures/jams

Avoid or use a specialist heavy-duty chute

Hazardous waste (chemicals, asbestos)

No

Prohibited – risk of contamination or damage

Use licensed waste carriers/containers

Liquids, wet mortar

No

Can cause blockages, spills, or material degradation

Pump or sealed drums only

Substantial/heavy items (e.g., full doors, baths)

No

Exceeds safe load/flow; risk of jam or chute damage

Crane or manual ground-level disposal

 

For standard setups, limit to 10–12 sections (≈10–13 m total drop) to maintain stability and reduce blockage risk. Taller drops require intermediate bracing or ties to the scaffold.

Drop materials steadily rather than all at once; avoid overloading with large or interlocking items (e.g., long timber). Ensure the chute hangs straight and free of kinks. Regular visual checks during use help catch early issues.

Minimal – rinse with water after heavy use to remove residue, inspect for cracks/abrasion before each job, and store stacked indoors when not in use. The UV-stabilised material handles outdoor exposure well, but avoid prolonged storage in direct summer sun.

It’s not always mandatory, but HSE and CDM 2015 strongly recommend enclosed systems for debris from height to prevent falling-object risks (Work at Height Regulations 2005). Many principal contractors now specify chutes on sites over 2 storeys for compliance and insurance purposes.

Yes, using our universal fixing frame or compatible brackets – secure to stable ledgers or parapets. Always have a competent person verify anchorage and load path before use.

A typical 10 m setup (hopper + 9 sections + frame) weighs about 90–110 kg. The sections are lightweight (8–10 kg each) and stackable, making them straightforward to load/unload from vans and ideal for nationwide delivery or site-to-site moves.

Reviews

There are no reviews yet.

Be the first to review “Rubbish Chute 1.1m Section”

Your email address will not be published. Required fields are marked *